How long does a 3D exterior rendering take from start to finish?
- 4 minread
- $199per image, renders from
- 3–5 business daysto first draft
- 11 daysmedian to final, 185 projects benchmarked
A 3D exterior rendering at Praxis Studio usually reaches a first draft in 3 to 5 business days after complete drawings, and the approved final follows in about 11 business days. Those figures are measured: across 206 delivered projects the median was 4 business days to first draft and 11 to final (the full benchmark).
| Stage | Typical time at Praxis Studio |
|---|---|
| Brief and file review | At the start, before modelling |
| First draft of the view | 3 to 5 business days from complete drawings |
| Each revision round | Depends on how fast your team returns one consolidated markup; two rounds are included |
| Final approved render | About 11 business days from the brief (median of 185 projects) |
| Animation or VR | Scheduled in the written quote |
How long yours takes depends mostly on how complete your drawings and material choices are, and on the number of revision rounds. Clear CAD, Revit or SketchUp files with defined finishes move fastest; gaps and late design changes add the most time. Send the drawings and your deadline and you get a written quote with the schedule before any work begins. Prices start from $199 per image (pricing).
- 3-5Business days to a first draft
- 11Business days to finals, about
- $199Exterior render, from, per image
The work runs in five stages
The schedule is the sum of five stages, and the review loops usually take the longest. Each stage depends on the one before it.
- Brief and file review. The studio checks your drawings, references and material list.
- Modeling and scene setup. The building, site and landscape are built from your files.
- First draft. You see the camera angle, lighting and basic materials.
- Markups and revisions. You send comments and the studio updates the image.
- Final delivery. The approved view is rendered at full resolution.
Stages two and three are mostly production. Stage four depends on how fast your team reviews and how many changes you request.
Complete inputs shorten the schedule
The more finished your inputs are, the less time the studio spends guessing. Guessing leads to rework.
We work from CAD, Revit and SketchUp drawings, reference images and material lists. Plans, elevations and sections should agree with each other.
Material decisions matter just as much. A named brick, cladding or glazing type lets the studio build it once. “Something warm and modern” means several test versions.
Site context also counts. Send photos or a site plan for neighboring buildings, trees and roads. Without them, the studio must invent a setting and you must then correct it.
Scope changes the length more than size does
A single street-level view takes less time than a full set. Each added view needs its own camera, lighting and checks.
Aerial and masterplan renders cover more ground. They need more site modeling, such as roads, landscaping and surrounding blocks. Plan for more time than a close-up of one facade.
Time of day matters too. A dusk scene with lit windows and exterior lighting involves more setup than a daylight view. Asking for day and dusk versions of the same building means two finished images.
A generic example shows the pattern. For a 50-unit mid-rise, one front elevation view is a small job. Adding a rear view, a courtyard view and an aerial turns it into a larger one.
If you want to see typical exterior scopes, read our five-storey mid-rise exterior case study or the office complex at dusk.
Revision rounds are the biggest variable
Revisions are where schedules stretch most, because they depend on your own review pace. We deliver in rounds with your markups, so each round is a clear checkpoint.
You can keep rounds short in a few ways:
- Collect all comments from your team into one markup per round.
- Mark changes directly on the draft image.
- Settle the massing, materials and camera angle early.
- Save fine-tuning, such as plant types, for later rounds.
Big changes late in the process cost the most time. Moving a window or swapping a facade material after approval means rebuilding parts of the scene. Small color and lighting tweaks are far quicker.
Time zones help here. Our working hours overlap with US and UK mornings. You can send markups at the end of your day and often discuss them early the next one. Clients in Europe get the same overlap.
What to ask any studio before you hire
Ask for a dated schedule after the studio has reviewed your files.
A date given before that review is a guess.
Use these questions to compare studios:
- Which stage does your date assume has finished?
- How many revision rounds are included?
- What happens to the date if the design changes midway?
- Which file formats will you accept?
- What resolution will the final image be?
Cost follows the same logic as time. Exterior renders start from $199 per image, and the final price depends on scope. Extra views, aerials and heavy site work raise both price and schedule.
If your project has a fixed presentation or submission date, say so at the start. Then the studio can tell you honestly whether the scope fits.
To get a schedule for your own project, send us your drawings and deadline through our contact page. You can also reach us by phone or WhatsApp at +1 469 392 4389.